sh. construction of 40.00 mtr, span psc box grider bridge at rd 1/076 and formation cutting, passing places, r/wall, cross drainage work, gsb, wbm-ii, wbm-iii, tarring work, side drain and parapets in km 0/0 to 2/500) including five year routine main