balance work of ctr(s) of 1.470 tkm and trr (s) of 12.234 tkm of the existing 52 kg 90 uts rails lwr laid on st/wooden/cst-9 sleepers to m+7 density with 52 kg/60 kg rail on psc sleeper with elastic fastenings including increasing the ballast cushion with