construction of cc drain from h.no. 1-9-35/48/48/1 c to opp. h.no.1-9-35/48/3/5, opp. 1-9-35/48/3/5 to cc main drain, opp. h.no.1-9-34/3/a to h.no.1-1-35/4/8/1, ho.no. 1-9-35/4/13/6 to renuka yellamma thalli temple and h.no. 1-9-17 to 1-9-34/3 in division