de-silting of pusta road nalla from 28 ft road to mariginal bandh road both side sh 1- 1 st, 60 percent of desilting of drain in 1 nd phase from 16.01.2025 to 15.06.2025 sh 2- 40 percent of desilting of drain in 2nd phase from 16.06.2025 to 15.01.2026 in