construction of 2 nos. of infiltration well at ponnankurichi (tamirabarani river bed) with 25 hp motor and pumping line 360 m with hdpe 180 mm dia pn 8 from ponnankurichi scheme near river bed to pump room in moolaikaraipatti balance work to be carried